Three posts replaced under a Craftsman bungalow
Example project

- Home
- 1920s Craftsman bungalow in Lake Forest Park with a concrete stem wall
- Original request
- A front room whose floor slopes toward the porch side
- Outside
- A wide porch on tapered columns and a concrete wall at its base
- Under the floor
- Posts and pads in a crawlspace, three of them failing
- Not included
- Floor and porch finishes
- Cost
- $4,200
Scope of work
Temporary supports, three new posts on new pads under the floor girder, connectors, and the ground cover put back. Floor and porch finishes are not part of this cost.
Project overview
In this example, the owners of a 1920s Craftsman bungalow in Lake Forest Park feel the floor slope toward the porch side of the front room. The house stands on a concrete stem wall with a crawlspace beneath it.
The plan goes under the floor, checks every post and pad, and replaces the three that have failed. The porch columns and the stem wall outside are only looked at, not worked on.
The goal
The goal is a floor carried on sound posts and pads, with the stem wall and the porch base looked at on the same visit.
Process
- Before work The floor is measured from the front door to the back and the crawlspace is entered.
- Prop Jacks carry the girder so the old posts can be taken out.
- Replace New posts go on new pads and are connected to the girder.
- Close up The jacks come out and the ground cover is put back.
Planning right
- Tell us where the floor slopes most and when you first noticed it.
- Ask for photographs of every post, not just the failed ones.
- Keep the crawlspace vents and the hatch clear.
- Ask whether the stem wall and the porch base will be looked at during the visit.